logo

FLUOR TURNER CAMP BASTION (0) CONRACT# HERR/ITT/45044-UK POWER SUPPLY TO COMBIND RAOC, CAM

PROJECT COMPLETED

logo

BHG USMC Site Preparation, Grading , Compaction and Fencing


PROJECT COMPLETED

logo

UK W. GROUP, DOMESTIC FIRE STATION CANOPY A Turn Key Design-Built Project (Grading, Site Preparation, Electrical Work and Complete Canopy)

PROJECT COMPLETED

logo

US MARINE, STEEL DOORS Making Steel Doors and Installation at leatherneck (Fabrication, Painting, Fixing Locks and Hardware along with installation & Fixing in Place)

PROJECT COMPLETED

logo

PAE SUNSHADE – UK WORKS GROUP Building & Installation of Generator Sunshade and Distribution Panel Sunshade (A Turn Key Design-Built Project (Grading, Site Preparation, Electrical Work and Complete Sunshade)

PROJECT COMPLETED

logo

CAMP BASTION, TOMB STONE Kandak Commando Camp, Grading Asphalt Road Network, Anti-Vehicle Trench, force Protection, utilities, Bunkers and Maintenance

PROJECT COMPLETED

logo

KHOST, 16 Kilometers of Road Refurbished and 3 Kilometers of New Design and Build

PROJECT COMPLETED

logo

ANA GARRISON, USACE Garrison 4000 man camp, Grading, Asphalt Road Network, Anti-Vehicle Trench, Force Protection, Utilities, Bunkers, Maintenance

PROJECT COMPLETED

logo

ANA COMPLEX , USACE ANA Complex, Drug Enforcement Administration Complex, and Judicial Complex

PROJECT COMPLETED

logo

ANA BASE COMPOUND WALL, USACE Force protection and complete construction of wall and guard towers.

PROJECT COMPLETED

logo

CAMP JULIAN & CAMP PHOENIX , NATO Force protection, fuel storage, generator house, electrical work.

PROJECT COMPLETED

logo

USAID CAFÉ COMPOUND Enlargement and Construction of new CAFÉ compound east of existing US Embassy.

PROJECT COMPLETED

logo

ARIANA HOTEL HQ, US MARINES Force protection and general construction. Container housing and connex complex including water supply and sewer system.

PROJECT COMPLETED

logo

ANA TRAINING CENTER, USAID ANA Training Center: Including earthwork, site work access roads, water supply, sewer systems, walkways, and force protection measures, Force protection, fuel storage, generator house, electrical work.

PROJECT COMPLETED

logo

AMERICAN EMBASSY, KABUL Installation of 170 pre-fabricated building units, Anti-climb steel wall, steelwork & all the embassy steel gates renovation , force protection, water supply & sewer system, walkway, Generator works, partial renovation of chancery building light posts & outside electrification of the entire compound & installation of over 15000 L ft G.I. Conduits as a net work.

PROJECT COMPLETED

logo

PRESIDENTIAL PALACE, US MARINES Force protection measures, fuel storage, generator houses, electrical work and security wall construction.

PROJECT COMPLETED

logo

PAE GOVERNMENT SERVICES, LNC. Engineering and Construction Services

PROJECT COMPLETED

logo

Indian Embassy Installation of a Central Heating System, Boiler House, and an Underground Fuel Storage area in the Indian Embassy Residence along with force protection work.

PROJECT COMPLETED

logo

ARIANA HOTEL HQ, US MARINES Force protection and general construction. Container housing and connex complex including water supply and sewer system.

PROJECT COMPLETED

logo

ANA TRAINING CENTER, USAID ANA Training Center: Including earthwork, site work access roads, water supply, sewer systems, walkways, and force protection measures, Force protection, fuel storage, generator house, electrical work.

PROJECT COMPLETED

logo

AMERICAN EMBASSY, KABUL Installation of 170 pre-fabricated building units, Anti-climb steel wall, steelwork & all the embassy steel gates renovation , force protection, water supply & sewer system, walkway, Generator works, partial renovation of chancery building light posts & outside electrification of the entire compound & installation of over 15000 L ft G.I. Conduits as a net work.

PROJECT COMPLETED

logo

ANA 1st Commando Kandak Gamberi Garison Afghanistan Contract NO: W5J9JE-10-D-0004

PROJECT COMPLETED