Project Name /Brief Explanation of the Works Involved

Customer Point of Contact

Time Duration

FLUOR TURNER CAMP BASTION (0)
CONRACT# HERR/ITT/45044-UK POWER SUPPLY TO COMBIND RAOC, CAM
Dominick Kennedy

07March2011

07/May/2011

BHG USMC
Site Preparation, Grading , Compaction and Fencing
Donald Oliver
Leatherneck, Helmand

06 JUN10-

22JUL 10

UK W. GROUP, DOMESTIC FIRE STATION CANOPY
A Turn Key Design-Built Project (Grading, Site Preparation, Electrical Work and Complete Canopy)
RG Crew, Major GE (C)
Works Contract Officer
UK Works Group, Camp Bastion Helmand
APRIL10–JUNE10
US MARINE, STEEL DOORS
Making Steel Doors and Installation at leatherneck (Fabrication, Painting, Fixing Locks and Hardware along with installation & Fixing in Place)
Cory Miller, Project C. Officer
Leatherneck (03-Feb-2010)
FEB10- MARCH 10
PAE SUNSHADE – UK WORKS GROUP
Building & Installation of Generator Sunshade and Distribution Panel Sunshade (A Turn Key Design-Built Project (Grading, Site Preparation, Electrical Work and Complete Sunshade)
PAE Inc,
Lockheed martin Company
UK Works Group, in Camp Bastion
Helmand, Afghanistan

1st OCT 09

–30 OCT 09

CAMP BASTION, TOMB STONE
Kandak Commando Camp, Grading Asphalt Road Network, Anti-Vehicle Trench, force Protection, utilities, Bunkers and Maintenance
Glenn Sweatt, General Counsel
This email address is being protected from spambots. You need JavaScript enabled to view it. (30 April 2009)
Omer G.
Project Manager, ECCI
OCT 09 - FEB 09
KHOST,
16 Kilometers of Road Refurbished and 3 Kilometers of New Design and Build
Brad Olson
PAE-A Lock Head Martin Company
Email: This email address is being protected from spambots. You need JavaScript enabled to view it.
NOV 09 - MAR 10
ANA GARRISON, USACE Garrison
4000 man camp, Grading, Asphalt Road Network, Anti-Vehicle Trench, Force Protection, Utilities, Bunkers, Maintenance
Dr. Allen Roberson DynCorp Intl, Kabul Email: This email address is being protected from spambots. You need JavaScript enabled to view it. PH1:DEC07-SEP08
ANA COMPLEX , USACE
ANA Complex, Drug Enforcement Administration Complex, and Judicial Complex
Malik Mortaza, Vice-President,
Technologists Inc, Kabul
Cell Phone: 0700 28 3671
SEP 05- AUG 07
ANA BASE COMPOUND WALL, USACE
Force protection and complete construction of wall and guard towers.
Roy R. Carver
Red Sea, Kabul
Cell Phone: 0799 20 4381
DEC 05- AUG 06
CAMP JULIAN & CAMP PHOENIX , NATO
Force protection, fuel storage, generator house, electrical work.
Clark Hill, Program Manager
PAE Inc.
Telephone: 0016 202627233
MAR 04- DEC 04
USAID CAFÉ COMPOUND
Enlargement and Construction of new CAFÉ compound east of existing US Embassy.
Brad Olsen, Project Manager
PAE Inc.
Cell Phone: 0700 27 2217
JAN 04- OCT 04
ARIANA HOTEL HQ, US MARINES
Force protection and general construction. Container housing and connex complex including water supply and sewer system.
US Marines/ Special Forces MAR 03- SEP 04
ANA TRAINING CENTER, USAID
ANA Training Center: Including earthwork, site work access roads, water supply, sewer systems, walkways, and force protection measures, Force protection, fuel storage, generator house, electrical work.
Clark Hill, Program Manager PAE Inc. MAR 03- NOV 04
AMERICAN EMBASSY, KABUL
Installation of 170 pre-fabricated building units, Anti-climb steel wall, steelwork & all the embassy steel gates renovation , force protection, water supply & sewer system, walkway, Generator works, partial renovation of chancery building light posts & outside electrification of the entire compound & installation of over 15000 L ft G.I. Conduits as a net work.
Zalmay Khalilzad
US Ambassador
American Embassy, Kabul
Jul 2004
PRESIDENTIAL PALACE, US MARINES
Force protection measures, fuel storage, generator houses, electrical work and security wall construction.
US Marines JUN 03- NOV 03
PAE GOVERNMENT SERVICES, LNC.
Engineering and Construction Services.
Gregory A. Loughran
Project Manager.
PAE Government Services Inc. Wazir Akbar Khan, 0093070285504
Brad Olson, 0700 27 6217
Jan 02 – Feb 2003
Indian Embassy
Installation of a Central Heating System, Boiler House, and an Underground Fuel Storage area in the Indian Embassy Residence along with force protection work.
Nambiar, Indian Ambassador
Indian Embassy,
Kabul, Afghanistan
Jan 1992
ANA 1st Commando Kandak 

Gamberi Garison Afghanistan

Contract NO: W5J9JE-10-D-0004

LES - USACE
2014
 

MBC Afghanistan

afghanistan construction map

Message from our CEO

Coming soon. Read more...

Visitor Counter

Latest Video

Webmail Login

Jobs with MBC

Subcontractors

Go to top